The 100 kW threshold that opens the wholesale electricity market
A plant that exceeds 100 kW of maximum demand at one site may buy at a negotiated price instead of a regulated…
A plant that exceeds 100 kW of maximum demand at one site may buy at a negotiated price instead of a regulated…
The complex supplies a large share of the country's hydro generation, yet it does not belong to the country. It is administered…
Two publications from the system operator, uploaded on the same day, close July 2026 with different generation totals. The difference is small…
The electricity market administrator publishes 744 hourly values per month and no average at all. The average is built by whoever reads…
Uruguay, 99% renewable" travels well on a slide. But a location decision that lasts a decade shouldn't rest on a single year's…
In a tropical climate, air conditioning sets a commercial building's power bill. Panama already regulates it with a building code (RES v2);…
IFC's EDGE requires a 20% reduction in energy, water and embodied carbon against a local baseline building; LEED targets integrated excellence. How…
Panama has roughly 170 MW of self-consumption solar and a dollar economy that simplifies the payback math. We break down the distributed-generation…
Panama's sun measures somewhere between 4.8 and 5.5 kWh/m² per day depending on the source, and its installed solar capacity reached 695.55…
Uruguay passed 1,525 MW of installed wind and aims to add 1,000 MW of solar by 2030. The challenge is no longer…